Monday, 29.06.2009, the insulation is ready

with the insulation they are done un missing only the hoses for floor heating. Runs would be a very soft carpet was laid. But we'll get an idea of how it will look like.
Since the inner wall also is getting drier, while white, the rooms are even more homely.

It has, however, something changed ... what? is betrayed only on 07/07/2009! Do you find it out?






Wilma let me in!


Thursday, June 25, 2009

Halle Berry Hairstyle In Catwoman Movie

Thursday, 25/06 .2009

second Day of the installers and it is going well. On the Film were then placed on Styrofoam insulation panels and insulation mats were laid out again with black insulation film. The pipes seem to be all moved so that the installers are now fully compatible with the insulation and then deal with the heated floor.

When we arrived, we have helped the men get to their car from the mud. As Arne it with the shoulder has had to push and Sigrid was then very very very muddy.








The HWR is filled with cables!

need in the dry wall or by Kati ardently desired subjects.




What Happen To Cyntherea

Wednesday, 24/06/2009 scaffolding away


Wednesday, June 24, 2009

Dream Mousse Blushes Swatches

Wednesday, 06/24/2009 installers have begun

have now started the installers. It was initially designed everything with foil. Of the three men and a foil insulation, a carrier for the sanitary and heating installation has taken over. They are really fast and just as it looks Give yourself a lot of trouble with the strict requirements as regards the place of consumption in the utility room to meet. Thank you!
breakthrough in the OG (Chrissi was very remarkable)

our new heating
The heating distribution in the EC
That is the film under the insulation. In the far corner you see the implementation of our outdoor faucet.

mount in the guest bathroom toilet

sewer line for wash basin and shower in the guest bathroom.

sink and toilet in the upper bracket Bad

heating distribution in the floor. The only sensible course was in the dressing room. Unfortunately now all the lines run through our bedroom. We are anxious to see if that was not too warm in the heating season.

The heating and the domestic electrical wiring harnesses
The first sewer pipe ... in this corner are still a few pipes.

sewage pipe in the kitchen

Wednesday, June 17, 2009

Migrateing Clock Pokemon

Tuesday, 06/17/2009


Here is an updated schedule.

We will not release the week of delay. This time the attempt to predict the future course:

Tuesday, June 16, 2009

Waxing During Herpes Outbreak

new schedule Monday, 16/06/2009 Sigrid has birthday and the cleaners are ready

has today Sigrid birthday. Congratulations. All have made a little earlier closing time for dinner and we cooked with our new wok a really good food.

After cleaner in the last week eingesaut the whole house once have they done today become.
looks right now like a home. For this, the plaster with a monstrous machine that was in the house and a large silo that stood in front of the house made . then sprayed with a hose to the wall and then spread smooth. Very smooth! Sieht wirklich gut aus und wir hoffen, daß Andre direkt darauf kleben kann. In den Badezimmern wurde der Putz nicht aus Gips sondern aus Sand hergestellt. Die Spachtelarbeiten an den Rigipsplatten sind aber überraschender Weise nicht Sache der Putzer sondern der Trockenbauer.
Alles in allem läuft es gut und wir nähern aus der Zielgeraden. Nun werden noch die Fliesenarbeiten und die Medienanschlüsse Herausforderungen. Leider scheint sich der Außenputz zu verzögern und somit auch die Dachkastenarbeiten und die Demontage des Gerüstes. Unser Bauleiter hat uns heute zugesagt, das Gerüst umbauen zu lassen, so können wir hoffentlich am Wochenende mit den Buddelarbeiten beginnen.