Wednesday, June 24, 2009

Dream Mousse Blushes Swatches

Wednesday, 06/24/2009 installers have begun

have now started the installers. It was initially designed everything with foil. Of the three men and a foil insulation, a carrier for the sanitary and heating installation has taken over. They are really fast and just as it looks Give yourself a lot of trouble with the strict requirements as regards the place of consumption in the utility room to meet. Thank you!
breakthrough in the OG (Chrissi was very remarkable)

our new heating
The heating distribution in the EC
That is the film under the insulation. In the far corner you see the implementation of our outdoor faucet.

mount in the guest bathroom toilet

sewer line for wash basin and shower in the guest bathroom.

sink and toilet in the upper bracket Bad

heating distribution in the floor. The only sensible course was in the dressing room. Unfortunately now all the lines run through our bedroom. We are anxious to see if that was not too warm in the heating season.

The heating and the domestic electrical wiring harnesses
The first sewer pipe ... in this corner are still a few pipes.

sewage pipe in the kitchen

0 comments:

Post a Comment