Saturday, July 25, 2009

Watch Elvis Online Starring Kurt Russell

Saturday, 25.07.2009



Es sind nicht mehr viele Spalten offen!!

Friday, July 24, 2009

Large Outdoor Rabbit Hutches With Runs Blueprints

schedule Friday, 24/07/2009 earthworks

Nachdem wir uns schweren Herzens bei der Regenwasserfrage für die Sickeriglos entschieden haben hat Herr Henke auch schon wieder sehr schnell angefangen und die Arbeit, wie gewohnt zuverlässig, erledigt.


Nun sind die Regenwasserrohre angeschlossen und auch die Reinigungsflansche verbaut.

Aufregender war an diesem Tag, daß plötzlich viel Erde auf unserem Grundstück war?!?!?

Zum Hintergrund: Auf der Suche nach der besten "Sandlösung" Arne looked around in the neighborhood and found no 100m basement work from us. The company was a company that we had in the past done this before an offer. Unfortunately we arrived 10 days late, because a large part of the world had already left, but said the boss, everything is still there after filling, we make over and take only the wages. Sorry Arne came over yesterday evening and saw that the filling was finished but we did not care. Too bad was probably not enough :-(
But as I said, Arne was so suddenly this morning before the mountains, and while he still doubted his sanity arrived already two men and a large excavator. The question the price could answer any of them and they began to distribute the sand. The same conditions from the previous day were still very satisfied and so we can be and are the same company security officer at the "mother land question" again.
Now our site looks already almost done :-) The slope of our neighbors is unfortunately a bit too steep, that we will have to be corrected once. But a good deal we have done in any case and we are the first barbecue party on our own turf a nasty, low step closer.



Look their way, the flash? Since Wednesday, a storm is raging here! Signed Lightning :-)


Thursday, July 23, 2009

How Long Till You Get Over Strep

Thursday, 23/07/2009 sanitary center

Behind sanitary middle:

commissioning of the heating. The now runs a startup program and will run up in the next 14 days at 50 ° flow temperature and then back down. The climate in the house is something very humid and we have to be lots of air. Moreover, were executed, the shower stalls and bathtubs.



Tuesday, July 21, 2009

Best Stations For Fm Transmitters In Philadelphia

Tuesday, 21.07.2009 Meeting with Mr Mellin

Today was on the Construction site of the blower door test instead. This test determines the tightness of the house. For this purpose, all openings sealed and vacuum created by a fan. When 10 different pressures in each case measured how much air flows. Thereafter, the test is repeated over and measured the air pressure loss. From all points and the two types of measurement, the mean genommen.Das law requires here max 3%, a house with Belüftugsanlage must provide 1.5% and a passive house under 1%. Our house reached 1.36%! I think we can be very satisfied.

Then we have with Mr Mellin yet discussed the shortcomings. The biggest deficiency was present the facade. After some back and forth, were the hump above the upper gable window and measured as it was exceeded a height of 4mm decided to make the facade again.

The rest were multiple small defects that are all but eliminated.

Monday, July 20, 2009

How To Determine Max Wattage For Light Fixtures

Monday, 20/07/2009 House connections completely

were today found the service connections completed. Now we have electricity, water, waste water and gas in the house. The bell does :-)
have also completed the garage builder the foundation for the garage and spread the sand hill on the property. The small excavator from Mr. Henke was just standing still behind a mountain (extra used as a screen), unfortunately the mountain was dann weg.



Nun sieht unser Grundstück ja gleich ganz anders aus. Allerdings sehen wir nun auch, daß wir noch reichlich Erde brauchen.

Neben den ganzen Anschlußarbeiten war heute auch still und leise der Mann für die "Nacharbeiten " da und hat die Deckendurchbrüche und die Deckenfugen verspachtelt.
Wieder einmal wird hier die spannende Frag sein, was Andre dazu sagt :-)




Thursday, July 16, 2009

How Much Skoal Is Bad

Thursday, 07/16/2009 Today, much has

Heute ist sehr viel passiert, aber wenn ich mir den aktualisierten Schedule look, it is now are more likely days on which several firms are working simultaneously.

But first things first:

first Waterworks

The waterworks would come at 8.00 am and set the drinking water supply. The good Christian was there punctually at 7.30, but as Arne arrived at 8:30 to meet with the farmers garage was not a "Aquarius" to see ...

Instead, the structure was dismantled and we now have a clear view of our house










The builders were farmers, this is a nice experience: Throughout the breakdown, the men were constantly on one, lying in the grass part by scaffolding. To the question, "but also that belongs to you?" we got the answer: "yes, but it's broken." While we have an answer, or at least sought a connection between our question and his response after he pushed, "we take it even with" Okay so all later " in earning ", but 1 hour, they then started the cargo to be secured with belts all the parts ...? No of course not, our broken part was still there, but just when I wanted to go forth again was the amazing thing he took the part, carried it to the truck, past the truck and threw it on the opposite site to the local parts of the scaffold. Hmmmm I'm assuming it's the same scaffolding company ... the world is well known, small.

second Back to the waterworks

They had reported the meantime, but would not have the material and are also still in a house around the corner.

third The floor slab for the garage

met Mr. Lengemann with his construction crew into two vans and immediately was unloaded.
After we announced our desire height for the garage floor - then the shock. Messing up the whole thing under the roof box. The garage like it under here, but the roof sections are fittingly mounted from above and there are 40 predefined cm. Thus, all considerations, whether we find a level attractive or not, would have done ... It would be two stages. After another call to the NL Central leader of the garage it was still 30cm. Still too high! Now it was packed Lengemann ambition and he called again at the mechanic, and after much back and forth and the threat: "Then do not have a garage" there were still 20 cm. Still not perfect but I think the best way.

So the men were able to begin Monday and are expected to be ready.





2a) Waterworks

Nicht in Sicht

4) Trockenbauer

Heute war auch noch der Beginn der letzten Trockenbauarbeiten.

Nach den üblichen Meckereien, " alles noch zu feucht", "mehr lüften", "hier müssen die Putzer noch ihr Band abschneiden" legten die Männer dann doch los.

Katrins Fächer werden aufgrund der Höhe und der Abstände dem Fliesenleger bestimmt noch Kopfschmerzen bereiten. Aber sie sehen toll aus und werden mit Sicherheit sehr zweckmäßig sein.
Ansonsten wurden heute die Vorwände geschlossen und die Badezimmerdecke beplankt.





2b) water works

The waterworks came and was a very good job done.

Christian's very close, but space-saving installation requirements were complied with by the waterworks. Thank you for that, we can use every square centimeter.



Now we have a heater, an e-distribution, indoor plumbing and the gas terminal is also ready.

What is missing is still

Vattenfall (on 20/07/2009)
Telekom (also in the next week) cable
Germany (Did I forget) you can imagine, we have forgotten the request, he then faxed yesterday and hope Now that the specified Period of 15 weeks is a Joke!

to Sun, it will be for today have been too!

Oh No - there was still something!

Dear Mama, dear Papa!
to your 38th! Wedding anniversary, we wish you all the best and love!
1000 Knut Schis from Kladow of your daughter, Christoph & Arne

How Long Till You Get Over Strep Without Medicine

Wednesday, 15/07/2009 The plaster is tuned

Today was the cleaner there and the exterior plaster applied.

Unfortunately, on the garden side of a house not plastered good and so was the flush can be applied again. But very good that they have made equal by itself and did not even as if they do not see it.

In recent days, the electrician became almost done ... we already have a doorbell ...
Gasag and laid the gas connection.




Sunday, July 12, 2009

Causes Of Extremely Painful Periods

Sunday, 7/12/2009 roof box and deleted the service entrance

This week is a lot happening.

Bsonders on Saturday was unexpectedly busy.

It met:

Christian, Bernd Manuel, Andre, Christopher and Arne to install the LEDs in the roof box and painting the roof box. After very careful spackling of holes by Bernd and Manuel could finally be painted. Unfortunately, Christian and Arne had large sections on both sides of the roof box they decay to find the cables. Bernd fell upon the gable, while Manuel, Andre and Arne painted the boxes. The final touches they then received from Andre, who stressed the boxes a second time. Many thanks to all helpers on that day!

also were still the masters of the Henkel company and since excavated the trenches for the house connections. When you consider how long the men had to work with their excavators, we are glad that we have given in the end the job and do not themselves have dug :-)

met Suddenly, even an employee of Ribo, and put an additional switch, so we are confident that the electrical system on Monday is ready and the connection on 20/07/2009 I hope there is no impediment.


















Today

Thursday, July 2, 2009

Denise Milani Smaller Breast

Thursday, 07/02/2009 external insulation

was begun with the exterior insulation and poured the cement floor. Since we now have four days is not allowed into the house there is only exterior shots.
The insulation looks like stracciatella. Today was to assembly work is 6 plus 4 men on the floor company. I think so many have never been the same on the site. Chrissi evening then has still provided entertainment for the isolation and all questioned.

and? already found out what is different?
except the insulation?