Thursday, July 16, 2009

How Much Skoal Is Bad

Thursday, 07/16/2009 Today, much has

Heute ist sehr viel passiert, aber wenn ich mir den aktualisierten Schedule look, it is now are more likely days on which several firms are working simultaneously.

But first things first:

first Waterworks

The waterworks would come at 8.00 am and set the drinking water supply. The good Christian was there punctually at 7.30, but as Arne arrived at 8:30 to meet with the farmers garage was not a "Aquarius" to see ...

Instead, the structure was dismantled and we now have a clear view of our house










The builders were farmers, this is a nice experience: Throughout the breakdown, the men were constantly on one, lying in the grass part by scaffolding. To the question, "but also that belongs to you?" we got the answer: "yes, but it's broken." While we have an answer, or at least sought a connection between our question and his response after he pushed, "we take it even with" Okay so all later " in earning ", but 1 hour, they then started the cargo to be secured with belts all the parts ...? No of course not, our broken part was still there, but just when I wanted to go forth again was the amazing thing he took the part, carried it to the truck, past the truck and threw it on the opposite site to the local parts of the scaffold. Hmmmm I'm assuming it's the same scaffolding company ... the world is well known, small.

second Back to the waterworks

They had reported the meantime, but would not have the material and are also still in a house around the corner.

third The floor slab for the garage

met Mr. Lengemann with his construction crew into two vans and immediately was unloaded.
After we announced our desire height for the garage floor - then the shock. Messing up the whole thing under the roof box. The garage like it under here, but the roof sections are fittingly mounted from above and there are 40 predefined cm. Thus, all considerations, whether we find a level attractive or not, would have done ... It would be two stages. After another call to the NL Central leader of the garage it was still 30cm. Still too high! Now it was packed Lengemann ambition and he called again at the mechanic, and after much back and forth and the threat: "Then do not have a garage" there were still 20 cm. Still not perfect but I think the best way.

So the men were able to begin Monday and are expected to be ready.





2a) Waterworks

Nicht in Sicht

4) Trockenbauer

Heute war auch noch der Beginn der letzten Trockenbauarbeiten.

Nach den üblichen Meckereien, " alles noch zu feucht", "mehr lüften", "hier müssen die Putzer noch ihr Band abschneiden" legten die Männer dann doch los.

Katrins Fächer werden aufgrund der Höhe und der Abstände dem Fliesenleger bestimmt noch Kopfschmerzen bereiten. Aber sie sehen toll aus und werden mit Sicherheit sehr zweckmäßig sein.
Ansonsten wurden heute die Vorwände geschlossen und die Badezimmerdecke beplankt.





2b) water works

The waterworks came and was a very good job done.

Christian's very close, but space-saving installation requirements were complied with by the waterworks. Thank you for that, we can use every square centimeter.



Now we have a heater, an e-distribution, indoor plumbing and the gas terminal is also ready.

What is missing is still

Vattenfall (on 20/07/2009)
Telekom (also in the next week) cable
Germany (Did I forget) you can imagine, we have forgotten the request, he then faxed yesterday and hope Now that the specified Period of 15 weeks is a Joke!

to Sun, it will be for today have been too!

Oh No - there was still something!

Dear Mama, dear Papa!
to your 38th! Wedding anniversary, we wish you all the best and love!
1000 Knut Schis from Kladow of your daughter, Christoph & Arne